Day 1: Pre-purchase Survey with vessel afloat In order to inspect a vessel of this size with the appropriate level of detail required for a pre-purchase survey, this boat was inspected over a two day period. The first day was spent with the vessel afloat, tied to her pontoon berth at Chichester Marina. [caption id="attachment_2821" align="aligncenter"…
Read more